The theme support measures specification is used to document the support measures that are planned to be used in different sections of the tunnel. Anchors, steel grid, type and amount of shotcrete, measures for presecuring, injections as well es dewatering drillings, sealing, measures for a temporary floor and lots of other parameters can be collected. The specification can also be used as a blueprint for documenting actually used support measures later on.