In the tunnel tape, informations from all 2doc modules are plotted in reference to advance meter in a single file. The combination of geological content with data from measuring systems, support measure documentation, TBM parameters etc. enable the clear arranged presentation and the recognition of contexts. The integrative overview includes essential informations for consulting, controlling and supervision in the turn of a tunnel project.